IMG_6573
Crane lifting part of one of the “arms” or supports that are going around the concrete slab.
IMG_6583
Several of the supports are already in place. They are much bigger in person.
IMG_6587
The pop outs are mostly finished at the main entrance, and look really good. Stainless steel, or aluminum?
IMG_6598
This area is just inside the main entrance heading north. Getting closer to being finished. Lots of areas have the “drop” ceilings ready for ceiling tiles. AC vents / uptake vents / sprinkler heads are being put into place first.
IMG_6610
The main support beams and “crosses” are in place for covered parking and solar? Maybe?
IMG_6617
The areas on the edges have massive concrete supports that will hold them upright. The rebar is being welded to the supports. The concrete foundations are as big as a Volkswagen!
IMG_6629
The Gym area bathrooms will contain showers and lockers.
IMG_6655
Halton. More and more equipment is showing up in the kitchen area. This is an exhaust hood.
IMG_6656
This area will be a dish washing area. There is a window that will be open to “return” a tray, plates, glasses, utensils, etc. At least that’s what this area looks like.
IMG_6662
Drop ceiling in the serving area. Above the lift on the left hand side, you can see another exhaust hood. For above a freestanding grill, perhaps.
IMG_6674
This area is exactly opposite of the kitchen / serving area of the cafe, and it looks like some built in seating? or low plant shelves maybe. This area is getting much closer to being finished out.
IMG_6699
GO DADDY G R E E N !!!! Finally some color on the walls! OK so most of the painted areas are white. Its nice to see some familiar GREEN!!!
IMG_6706
Second floor, north area, YES its cubicles being assembled. Over 800 on the second floor. I imagine this area will look MUCH different in one weeks time.
IMG_6713
Second floor conference room? It will have 2 raised levels of seating. This is exactly above the 1st floor area with the circles above it.
IMG_6725
The sinks and fixtures are installed on several of the bathrooms. All touchless, which is as I see it, a nice touch!
IMG_6779
The concrete slab with the supports around it, from the roof.
IMG_6807
You can see the concrete slab, and some of the concrete bases for more support arms. Just beyond you can see another outdoor feature, with some block work going on. Planters? Outdoor stadium style seating? Perhaps both….. Just a thought.
IMG_6827
Some of the crew that is assembling the supports / arms that are going up around the main concrete slab.
IMG_6831
Another angle on the biggest outdoor feature, so far. I was surprised when I got to the site and saw these huge supports surrounding the main concrete slab.
All images shot with the Canon 5D Mark II, EF 24-105 F4 L IS lens. Indoor shots got some help with the Canon Speedlight 580 EX II, camera mounted. All of the images taken of the site can be seen at JLPPIX.com, under the “Friends” gallery…. or click here.