Go Daddy’s new Tempe Call Center – Friday the 13th
Went by the site today on my way into work – they are pouring concrete – multiple cement trucks are on site now. I will take some more pictures after work and get them posted this weekend.
I took lots of pictures after work, but ran out of time to get them processed, and posted. I will add more over the weekend. Looks like the vapor barrier (yellow plastic) is down and ready to get covered with new concrete. It also looks like the foundation/stem wall forms are in place for the existing slab, Phase one, that was poured 10-14 days ago. It would not surprise me to see concrete poured on Friday, or Monday. Lots of standing water / mud in places on site. Main work areas were already to grade, so they appear to be much dryer / less muddy. I took pictures of the drainage pipes that will go into the ground, and help moving water away from the structures and parking areas.
Canon 5D Mark II, EF 24-105 F4 IS L lens, ISO-50, F8, 1/400 sec.