New Tempe Call Center – May 16, 2014
Second coat of paint going on the outside of the building.
View from the roof from Phase I looking towards Phase II. You can see some dirt work. Getting ready for the final grading.
View from the second story, looking out from the main entrance. Worker adding steel studs.
Inside the room with the pumps, looking out of a window/vent area. As always all images shot with the Canon 5D Mark II, and using the EF 24-105 F4 L lens. The Canon Speedlight 580 EX II camera mounted for flash fill on the interior shots. ALL images from this project can be seen HERE.
Leave a Reply