Photo a Day Challenge

GoDaddy’s New Tempe Call Center – January 31, 2014

GoDaddy 35

View from Warner. Lots of action happening inside the walls, and some things outside. The main stairwell on this end is growing and should be complete soon.

GoDaddy 37

The braces will be removed, only after the steel inside for the second floor and roof are tied to the walls.

GoDaddy 36

This is also shot from Warner. This will be the main entrance. Left side may be complete, the right side grows daily.

GoDaddy 34

View from by the job trailer, looking twards Warner. You can see the main stairwell from the backside, here. The braces appear to all be gone from the area where the steel is tying the first 50,000 square feet together. All of the images I shot Friday after work can be seen here. http://x.co/3lBtX

Leave a Reply

Your email address will not be published.